Shows & Exhibitions
   HB&R National Show
     2010

   HB&R Northern 2010
   HB&R National 2009
   Building into the
     Basement


News
   # BS 8102, 2009 #
   Basement -
     Housebuider



The Basement Information Centre
Riverside House
4 Meadows Business Park
Station Approach
Blackwater
Camberley
Surrey GU17 9AB

Tel: 01276 33155
Fax: 01276 606801

Email: info@tbic.org.uk

Case study

Institute of Manufacture, Cambridge

  Ref:
  119
  Title:
  Sika Watertight Concrete System - Institute of Manufacture, Cambridge
  Provided by:
  Sika Limited
  Summary:
  Sika Watertight Concrete was chosen in the construction of the Alan Reece Building, the new home for the Institute for Manufacture, recently commissioned by the University of Cambridge.
  For more information:
  orishaguna.bob@uk.sika.com

Sika® Watertight Concrete was chosen in the construction of the Alan Reece Building, the new home for the Institute for Manufacture, recently commissioned by the University of Cambridge. Founded in 1998, the Institute had, over the years, out grown its original site in the former Cambridge University Press warehouse in Mill Street.

The new £15 million, 4,500 sq ft building was designed by Arup Associates and built by Keir Marriott. It is a two-storey split-level concrete frame construction and is located on the University’s new site in West Cambridge. Incorporating the Sika® Watertight Concrete system had many benefits including simplified design and time saving on site through the elimination of laborious detailing of tanking membranes.
Importantly, it has provided a BS 8102 Grade 4 environment suitable for the storage of valuable archive materials and equipment.

The BBA certified Sika® Watertight Concrete system incorporates two state-of-the-art powerful Sika admixtures. These work firstly by reducing the water cement ratio, whilst producing a highly workable concrete to aid placement and compaction, and secondly, by blocking the remaining capillary pores. The system has a successful track record going back 50 years.

Lafarge Readymix supplied 800 cubic metres of Sika® Watertight Concrete to MJS Construction, who carried out the concreting on the project. Construction joints were sealed with 200 metres of the SikaSwell® jointing system, which consists of joint sealing profiles that expand on contact with water to seal any voids between adjoining concrete slabs and walls.

The building will incorporate state-of-the-art research equipment and teaching facilities, an Industrial Design and Innovation Studio, an Industrial Systems Workshop, together with a large common room area and open-plan office areas to house the department’s staff.

It is the first building at the university to achieve a Breeam (BRE Environmental Assessment Method) excellent rating for its eco-friendly features.



HOME ~ CONTACT US
FIND PRODUCTS & SERVICES ~ ASK OUR EXPERTS ~ CASE STUDIES ~ PUBLICATIONS ~ PICTURE GALLERY
ACCREDITATIONS
MEMBERSHIP ~ MEMBER AREA


© 2003 - 2010 Basement Information Centre
Site designed and hosted by iimco